Open-ceiling new work
Open-ceiling new work moves at pull velocity.
Cat6, Cat6A, and fiber backbones to ANSI/TIA-568 standards. Fluke Versiv 2 certified, results in Link-Live, OTDR-tested, and documented at handoff.
Structured cabling is the standards-based copper and fiber infrastructure that connects every network endpoint in a commercial or enterprise property.
Comple-Tech designs and installs Cat6, Cat6A, and fiber backbones to ANSI/TIA-568 standards, with certified terminations, tested links, and TIA-606 labeling that survives the next ten years of moves, adds, and changes.
Cat6 and Cat6A to wall plates, APs, and in-room drops.
MDF to IDF risers, campus links, OTDR certified at handoff.
Patch panels, keystones, and ports labeled per TIA-606.
J-hook, tray, conduit, and firestop scoped with the GC.
Link-Live certification reports, OTDR traces, and as-built cable schedule.
Survey & closeout
Cat6A standard on new pull.
Cat6A to guestrooms and AP backhaul, coordinated with the WiFi install. Certified with Fluke DSX on every link.
Cat6A to guestrooms and AP backhaul, fiber between MDF and floor IDFs, coordinated with the WiFi install. See hospitality WiFi for the guest-network scope.
Open-ceiling new work moves at pull velocity.
Cabling standard
ANSI/TIA-568 for performance, TIA-606 for labeling on every install.
Copper certification
Fluke Versiv 2 certified on every copper link, results in Link-Live. Re-pulled on first failure, retested.
Fiber testing
OTDR trace plus insertion-loss measurement on every fiber strand at install.
Cable categories
Cat6A standard on new pull; OM4 and single-mode fiber on backbones.
Labeling
Every port, jack, and patch field labeled to the as-built schedule.
Pathway audit, cable-tray and conduit review, IDF and MDF location confirmation, drop-count modeling per floor and zone, and a scope built from the walkthrough, back to the property owner with assumptions called out before procurement.
Cable type selection (Cat6 vs Cat6A vs fiber), run-count and length estimates against the 100-meter horizontal rule, termination plan, labeling scheme per TIA-606, and a full bill of materials handed back to the GC for pathway and power coordination.
Cable pull through pathway, termination at both ends, cable dressing in the IDF and at the work area, patch-panel buildout with labeled ports, and wall-plate installation with the labeling that matches the as-built schedule.
Fluke Versiv 2 certification on every copper link with full results in Link-Live, OTDR trace on every fiber run with insertion loss and reflectance recorded, complete documentation package, and a labeled handoff walk-through with property IT or facilities.
Can't find the answer here? Request a call.
Ready for a chat?